UTAH COUNTY'S COURTHOUSE BUILDINGScirca 1920 HISTORIC UTAH COUNTY COURTHOUSE
It was decided that a tour of the west coast be taken to see what had been done in other communities in the way of administrative buildings. On July 9, 1919, a party of city and county officials and the architect left for California. Visits were made to various localities of interest from Los Angeles on the south to Everett, Washington, on the north. This trip largely determined the type, size and cost of the building that was to be erected. On October 13, 1919, a meeting of city and county officials and an appointed building committee was held wherein sketches of the building were presented by the architect. After discussion and suggested improvements the sketches were accepted and the architect was directed to get the working drawings completed as soon as possible, and to get bids for the lower portion of the building. In the meantime the question of location and finally the direction the building was to face was decided. Bids for the construction of the ground floor of the building were called for on June 18, 1920; bids were opened and the contract for this portion of the building was let to Rudine and Chytraus, contractors of Salt Lake City, they being the lowest bidder. The corner stone of the building was laid in the presence of a large gathering on December 14, 1920. During the progress of this portion of the construction minor contracts were carried on in connection therewith for heating, plumbing and electrical work. In the meantime the work of finishing the plans and specifications for the entire building was carried on and bids were advertised for the completion of the super-structure. On June 22, 1921, bids were opened by the commission and the contract was awarded to Rudine and Chytraus, the low bidders. The work was carried on by Rudine and Chytraus and mainly finished at the end of the year 1922, but some carving and other minor jobs carried into 1923. In the fall of 1922 bids were taken for the completion of the building and the contract was again awarded to the low bidders, Rudine and Chytraus. In the spring of 1923 Rudine and Chytraus returned from California to take up the work. Upon their arrival the chairman of the county commission refused to carry on the contract and settlement was finally made with the contractors and the agreement cancelled. Bids were taken for the roughing of the plumbing and heating, and a contract was let on September 30, 1924, to P. L. Larsen of Provo. On November 30, 1924, a contract was let for the putting in of the lower floor to C. A. Tolboe of Provo. Bids for the completion of the building were again advertised and opened on June 14, 1925, The general contract was awarded to C. A. Tolboe of Provo. The work was begun in the spring of 1919 and completed in the late fall of 1926, so that the time consumed in the work is a little more than six and one-half years. INTERESTING FACTS ABOUT THE COUNTY BUILDINGIt cost $576,495.30. The building is more than a building; it is a work of art, a monument that has been set up in the county to the men and women whose industry has made it possible. It is Neoclassic in design; that is, it follows the classical features of Greek buildings, but is not really a copy of any building. The column-caps and the cornice are an adaptation from the temple of Minerva, on the Acropolis at Athens. This adaptation made by the architect has met with very favorable comment from creative architectural artists who have seen it. The exterior of the building is classic in design, that is, it follows the general lines of the master artists and architects of Greece who have been rated as the world's masters in the art of building . The lower or ground floor has been treated as the pedestal upon which have been placed the two upper floors which form the interior of the magnificent order. The whole is surmounted with a classic balustrade.
The pediment is filled with an exceptionally fine group of sculpture designed by Architect Joseph Nelson and carved from the solid stone in the full round by Joseph Conradi, sculptor of Salt Lake City. This group is symbolic and has been made to tell the story of the building. Here is the story of the group as the architect conceived it: "The building is a courthouse, therefore, quite consistently, Justice stands with her balances resting upon the law, in one hand, and with her sword in the other. The building is also to house the city and county offices, therefore, on the right hand of Justice sits a woman representing the County, supporting with one hand a shield bearing the inscription, County of Utah' and in the other a cornucopia, or horn of plenty, overflowing with the good things produced in the region. Then the various arts and industries are represented at her side. Her horticulture is represented by the fruit trees; her dairying and stock raising by the front quarters of an animal projecting beyond the tree; her mining by the pick and shovel at the side of the tunnel entrance to the mine in the mountain; and further down, her sheep raising and poultry farming, respectively."
"The second and third floors, however, have been treated in an unusual manner. A row of columns really form a part of the offices as the public are expected to do their business with officials really from the exterior of the office proper. This leaves the corridors more open and more pleasing."
"The floors of the main corridors are of Alaska marble tile, laid with borders of gray Tennessee marble. The pilasters and wainscoting are all of Alaskan marble. Many visitors ask about the design in the floor directly under the rotunda. Research shows it to be a popular geometric design of the period although eastern visitors say it is a Star of David."
|
||||||||||
| Home
| Departments
| County
Info | Online
Services | Residents
| Visitors
| Business
Links | Contact Us | Quick Find | Search | Help Copyright © 2006 Utah County Government. All Rights Reserved. Disclaimer/Terms of Use/Privacy/Security/Accessibility Statements.. |